[单选题]

A. new Ezonexam switch is installed into an existing LAN and a new VTP trunk is set up with an existing switch. Which VLANs will be allowed on this new trunk?

A.All defined VLANs are allowed on the trunk by default.

B.Each VLAN, or VLAN range, that is specified with the switchport mode command.

C.Each VLAN, or VLAN range, that is specified with the vtp domain command.

D.Each VLAN, or VLAN range, that is specified with the vlan database command.

E.None of the above

参考答案与解析:

相关试题

A Ezonexam switch is configured with all

[单选题]A. Ezonexam switch is configured with all ports assigned to VLAN 2. In addition, all ports are configured as full-duplex FastEthernet. What is the effect of adding switch ports to a new VLAN on this switch?A.The additions will create more collisions

  • 查看答案
  • You have just installed a new web server

    [单选题]You have just installed a new web server on the Ezonexam network. You are required to ensure that the web server is accessible from the Internet. The network uses private addressing, so an IP-to-registered address mapping is required.To do this, you

  • 查看答案
  • You are bringing up a new Ezonexam switc

    [单选题]You are bringing up a new Ezonexam switch, and wish to connect it via a trunk to another switch from a different vendor, which uses the IEEE standard for the trunking method. When setting the encapsulation type on the trunk, what should you configure

  • 查看答案
  • A new water boiler was installed in our building last week, which could provide hot water to the stu

    [单选题]A new water boiler was installed in our building last week, which could pro

  • 查看答案
  • Temperature control valves installed in

    [单选题]Temperature control valves installed in the jacket cooling water system of a diesel engine modulates the rate of water flow through the ().A . cooling water pumpB . nozzle cooling passagesC . cylinder jacketsD . heat exchanger

  • 查看答案
  • Fins are installed on the generating tub

    [单选题]Fins are installed on the generating tube surfaces in waste heat boilers to ().A . prevent soot fires in the exhaust systemB . prevent exhaust gas erosion of the tubesC . increase the velocity of exhaust gas flowD . increase the rate of heat transfer

  • 查看答案
  • After the robbery, the shop installed a

    [试题]A.ftertherobbery,theshopinstalledasophisticatesalarmsystemasaninsurance_________furtherlosses.A.)forB)fromC.)againstD)towards

  • 查看答案
  • Fusible plugs are installed in fire£­tub

    [单选题]F.usible plugs are installed in fire-tube boilers to _____.A.provide a means of draining the boilerB.warn the engineer of low water levelC.cool the crown sheet at high firing ratesD.open the burners electrical firing circuits

  • 查看答案
  • Bottom blow valves are installed on auxi

    [单选题]Bottom blow valves are installed on auxiliary water-tube boilers to ()A . remove suspended and precipitated solids from the boiler waterB . completely drain the boiler in an emergency situationC . prevent hardened scale deposits in the water drumD .

  • 查看答案
  • You are an administrator of the Ezonexam

    [单选题]You are an administrator of the Ezonexam switched network and your goal is to reduce some of the administrative overhead on your network. You plan on achieving this by configuring a new VLAN for each department in the Ezonexam network.H.owever, you n

  • 查看答案
  • A new Ezonexam switch is installed into