A .放大器
B .铁管
C .气管
D .通气孔
[单选题]Fins are installed on the generating tube surfaces in waste heat boilers to ().A . prevent soot fires in the exhaust systemB . prevent exhaust gas erosion of the tubesC . increase the velocity of exhaust gas flowD . increase the rate of heat transfer
[单选题]F.usible plugs are installed in fire-tube boilers to _____.A.provide a means of draining the boilerB.warn the engineer of low water levelC.cool the crown sheet at high firing ratesD.open the burners electrical firing circuits
[单选题]在MGW上,TUB板位于()A . 主机框的4&5槽位B . 扩展机框的5&6槽位C . 主机框的2&3槽位D . 扩展机框的2&3槽位
[单选题]The rate of heat transfer in a water-tube auxiliary boiler can be increased by ().A . operating the boiler at less than normal water levelB . installing fins on the firesides of water-tubesC . increasing the amount of excess air to the burnersD . tre
[单选题]英语AMPLIFIER指()A .放大器B .火灾盘C .检测元件D .通气孔
[单选题]英语ELECTRICAL指()A .电动的B .气动的C .电磁阀D .转换器
[单选题]英语TRANSMITTER指()A .变送器B .调节器C .定位器D .转换器
[单选题]英语SWITCH指()A .仪表B .开关C .按钮D .信号
[单选题]英语MEASURE指()A .仪表B .测量C .按钮D .信号
[单选题]英语SPRING指()A .活塞B .开关C .按钮D .弹簧