A . KB increases,increasing BM and therefore GM
B . KG increases due to the weight of the added water on deck
C . BM decreases from loss of water plane and greater volume
D . There is no effect on transverse stability
[单选题]Your vessel was damaged and initially assumed a significant list and trim; however,further increase has been slow. Based on this data,what should you expect?()A . The slowing is only temporary and the vessel will probably suddenly capsize or plunge f
[单选题]If your vessel is aground at the bow,it would be preferable that any weight removals be made from the().A . bowB . mid-sectionC . sternD . All of the above
[单选题]At 0400 your vessel is dead in the water and in heavy fog. Your loran set fixes your position at LAT 41°12.1’N,LONG 72°43.5’W. Bottom samples are taken and indicate a composition of soft mud and shell. Your fathometer reads 40 feet. If the vessel dra
[单选题]To improve your vessel’s stability in a hazardous situation,you should().A . ballast deep tanks if they are slackB . transfer ballast athwartshipsC . pump out double bottomsD . fill double bottoms from deep tank
[单选题]The point to which your vessel’s center of gravity (G) may rise and still permit the vessel to have positive stability is called the().A . metacentric pointB . metacenterC . metacentric radiusD . tipping center
[单选题]Please [delete]my name from your list.A.changeB.editC.omitD.copy
[单选题]On a passenger vessel,the vessel’s name must appear on().A . ring life buoyB . lifeboatsC . lifeboat oarsD . All of the above
[单选题]The procedure of strengthening damaged structures on a ship by using wood or steel is called().A . bracingB . batteningC . blockingD . shoring
[单选题]If the goods is damaged or lost in the process of logistics, the shipper can()to carrier.A . claimB . ask for payC . sueD . fight
[单选题]Aboard damaged vessels,the MOST important consideration is preserving().A . bilge pumping capacityB . reserve buoyancyC . level attitudeD . instability